TDM trage company has ordered Autodesk REVIT Families development in Soft4Cad.
TDM trage company has ordered Autodesk REVIT Families development in Soft4Cad.
TDM trage company has ordered Autodesk REVIT Families development in Soft4Cad.
The first stage in the DB, families or software development is the writing of high-quality technical requirement (TR). Properly created TR is already 50% of the success.
This document (TR) establishes the basic requirements for components-families of electrical cabinets and boxes manufactured by TDM trade Company.
Our Revit components (in-place REVIT Families) may be used in the electrical projects, architecture and design, created with the Autodesk Revit.
General requirements for components-families:
№ |
Criteria |
Requirements |
1 |
File format and version |
RFA 2019, 2020, 2021, 2022 |
2 |
File size of one 3D model |
Less than 1.5 MB |
3 |
Development level |
Exact overall dimensions. The external image corresponds to the real one. Level is LOD 300 |
4 |
Three levels of detail |
For cabinets, boxes: in low and medium detail – the designation of dimensions, in high - the model of the family |
5 |
The format of the result of the work and the method of transmission |
1. Component-family files in RFA format 2. A file with the all families in RVT format Transmission method: Internet |
Requirements for the parameters of the equipment that we have applied:
№ |
Parameters |
Example of a value |
Columns in the BOM (Bill of Material) |
1 |
ADSK_ Grouping |
no |
yes |
2 |
ADSK Name |
Box 3 of the module hinged plastic - an example |
yes |
3 |
ADSK_ Designation |
SCHRN-P-3 - example |
yes |
4 |
ADSK_ Product Code |
SQ0901-0008 - example |
yes |
5 |
ADSK_ Manufacturer |
TDM |
yes |
6 |
ADSK_ Unit of measurement |
piece |
yes |
7 |
ADSK_ Weight |
0.24 kg - example |
yes |
8 |
ADSK_ Note |
no |
yes usually empty, but the designer in the project can add |
All models are made in LOD300, in REVIT 2019 format – the oldest version that was supported at the time of development. The project was implemented within 4 months.
Stage 1 - Modular equipment
Stage 2 – cabinets
Stage 3 - protection and automation equipment
Stage 4 - Switchs
Stage 5 - Pipes
Stage 6 – cable trays